For new concrete:
- Leave it to dry at least 28 days.
- Apply Nippon Paint 5100 Wall Sealer as a primer, 1 coat.
- Apply Nippon Paint Weatherbond or other exterior paints as a top coat, 2 coats.
For old concrete:
- Apply the Nippon Paint Excel Primer, solvent- based, as a primer, 1 coat.
- Apply Nippon Paint Weatherbond or other exterior paints as a top coat, 2 coats.